Line Item Description
|
Total Project Costs
|
|
A. PRE
CONSTRUCTION COSTS: |
|
101 Architect,
Engineering & Soils Study Fees |
|
|
102 Design Review/Plan
Check Fees |
|
|
103 Permits -
City/County |
|
|
104 Utility Connection
Fees |
|
|
105 School/Park/Misc.
Taxes |
|
|
106 Project Bonds
|
|
|
TOTAL PRE-CONSTRUCTION
COSTS |
|
| B. "SITE"
CONSTRUCTION COSTS: |
|
|
General Requirements |
|
201 Temporary
Utilities & Facilities |
|
|
202 Special
Inspections/Testing-Geo-tech, Structural |
|
|
203 Job Security |
|
|
204 Equipment Rental |
|
|
205 Jobsite overhead
|
|
|
206 Project
Management/Supervision |
|
|
207 General
Contractor's office overhead/profit. |
|
|
208 State Sales Tax
(where applicable) |
|
|
210 Builder
Contingency |
|
|
SUB-TOTAL GENERAL
REQUIREMENTS |
|
|
|
|
301 Demolition
|
|
|
302 Clearing/Stakeout
|
|
|
303 Rough
grading/shoring/excavation/fill |
|
|
304 Site retaining
walls/waterproofing/backfill |
|
|
305 Site drainage
|
|
|
306 Private septic
system |
|
|
307 Domestic Water
well |
|
|
308 Pump house &
Pressure water system |
|
|
309 Environmental
|
|
|
310 Off-site
improvements |
|
|
SUB-TOTAL SITE
PREPARATION |
|
|
Foundation Complete with/ Foundation Endorsement |
|
|
|
401 Embedded hardware |
|
|
402 Ground Plumbing
|
|
|
403 Ground Mechanical
|
|
|
404 Ground Electrical
|
|
|
405 Underground
utilities |
|
|
406 Foundation &
Building retaining walls poured |
|
|
407 Concrete slab
poured-house, garage |
|
|
SUB-TOTAL FOUNDATION
COMPLETE |
|
|
Building Rough-in Completion |
|
|
|
501 Structural masonry
|
|
|
502 Rough framing
materials |
|
|
503 Structural steel
|
|
|
504 Modular or
Sectional Mfg. Home |
|
|
505 Package/Kit Home
|
|
|
506 Mfg.
Trusses/components |
|
|
507 Rough framing
labor |
|
|
508 Lightweight
concrete interior floors |
|
|
509 Plumbing top-out
|
|
|
510 Rough heating,
ventilation, air conditioning |
|
|
511 Rough electrical |
|
|
512 Fire protection
sprinklers |
|
|
513 Fireplaces incl.
Flues |
|
|
514 Security &
Communications pre-wiring |
|
|
SUB-TOTAL BUILDING
ROUGH-IN COMPLETION |
|
|
|
|
601 Waterproofing
decks, shower pans, etc. |
|
|
602 Gutters,
downspouts, sheet metal |
|
|
603 Roof covering |
|
|
604 Windows
|
|
|
605 Exterior doors
|
|
|
606 Skylights
|
|
|
607 Glazing
|
|
|
608 Exterior siding
(See Project Profile) |
|
|
609 Exterior trim
|
|
|
610 Stucco
|
|
|
611 Masonry veneer
|
|
|
612 Ornamental Iron |
|
|
613 Garage Doors
|
|
|
614 Exterior painting
|
|
|
SUB-TOTAL EXTERIOR
WEATHER-TIGHT |
|
|
|
|
701 Insulation
|
|
|
702 Drywall/Plaster
|
|
|
703 Interior stairways
|
|
|
704 Cabinetry
|
|
|
705 Finish
Materials/Millwork |
|
|
706 Interior Doors
|
|
|
707 Finish Hardware
|
|
|
708 Finish Carpentry
Labor |
|
|
SUB-TOTAL
DRYWALL/FINISH CARPENTRY |
|
|
Building Completion/Final Inspection/N.O.C. filed |
|
|
|
801 Countertops
|
|
|
802
Tub/shower/enclosures |
|
|
803 Interior
painting/Wall Coverings |
|
|
804 Hard surface
finish flooring |
|
|
805 Carpeting
|
|
|
806 Built-in
Appliances |
|
|
807 Special Equipment
(see property profile) |
|
|
808 Security system
|
|
|
809 Intercom
|
|
|
810 Built-in Vacuum
Cleaner |
|
|
811 Finish Plumbing
|
|
|
812 Plumbing Fixtures
|
|
|
813 Finish Electrical |
|
|
814 Lighting Fixtures
|
|
|
815 Finish Heating,
Ventilating, Air Conditioning |
|
|
816 Solar Backup
|
|
|
817 Bath Accessories |
|
|
818 Tub and Shower
Doors/Mirrors |
|
|
819 Finish Grading
|
|
|
820 Pool/Spa
|
|
|
821 Hardscape-Driveway,
Walkways, Steps |
|
|
822 Landscaping
|
|
|
823 Irrigation System
|
|
|
824 Fencing including
Gates |
|
|
825 Touch-up/Final
Cleaning |
|
|
SUB-TOTAL BUILDING
COMPLETION |
|
|
TOTAL "SITE" COSTS |
|
|
|
|
TOTAL PROJECT COSTS |
|