Harp Financial Mortgage Company                Home             

Construction Worksheet

California Construction Loans

Borrower Name:

 

Phone #:

Home: Work:

Property Address:

 

Line Item Description

Total Project Costs

A. PRE CONSTRUCTION COSTS:
101 Architect, Engineering & Soils Study Fees

 

102 Design Review/Plan Check Fees

 

103 Permits - City/County

 

104 Utility Connection Fees

 

105 School/Park/Misc. Taxes

 

106 Project Bonds

 

TOTAL PRE-CONSTRUCTION COSTS

 

B. "SITE" CONSTRUCTION COSTS:
General Requirements
201 Temporary Utilities & Facilities

 

202 Special Inspections/Testing-Geo-tech, Structural

 

203 Job Security

 

204 Equipment Rental

 

205 Jobsite overhead

 

206 Project Management/Supervision

 

207 General Contractor's office overhead/profit.

 

208 State Sales Tax (where applicable)

 

210 Builder Contingency

 

SUB-TOTAL GENERAL REQUIREMENTS

 

Site Preparation
301 Demolition

 

302 Clearing/Stakeout

 

303 Rough grading/shoring/excavation/fill

 

304 Site retaining walls/waterproofing/backfill

 

305 Site drainage

 

306 Private septic system

 

307 Domestic Water well

 

308 Pump house & Pressure water system

 

309 Environmental

 

310 Off-site improvements

 

SUB-TOTAL SITE PREPARATION

 

Foundation Complete with/ Foundation Endorsement  
401 Embedded hardware

 

402 Ground Plumbing

 

403 Ground Mechanical

 

404 Ground Electrical

 

405 Underground utilities

 

406 Foundation & Building retaining walls poured

 

407 Concrete slab poured-house, garage

 

SUB-TOTAL FOUNDATION COMPLETE

 

Building Rough-in Completion  
501 Structural masonry

 

502 Rough framing materials

 

503 Structural steel

 

504 Modular or Sectional Mfg. Home

 

505 Package/Kit Home

 

506 Mfg. Trusses/components

 

507 Rough framing labor

 

508 Lightweight concrete interior floors

 

509 Plumbing top-out

 

510 Rough heating, ventilation, air conditioning

 

511 Rough electrical

 

512 Fire protection sprinklers

 

513 Fireplaces incl. Flues

 

514 Security & Communications pre-wiring

 

SUB-TOTAL BUILDING ROUGH-IN COMPLETION

 

Exterior Weather-tight  
601 Waterproofing decks, shower pans, etc.

 

602 Gutters, downspouts, sheet metal

 

603 Roof covering

 

604 Windows

 

605 Exterior doors

 

606 Skylights

 

607 Glazing

 

608 Exterior siding (See Project Profile)

 

609 Exterior trim

 

610 Stucco

 

611 Masonry veneer

 

612 Ornamental Iron

 

613 Garage Doors

 

614 Exterior painting

 

SUB-TOTAL EXTERIOR WEATHER-TIGHT

 

Drywall/Finish Carpentry  
701 Insulation

 

702 Drywall/Plaster

 

703 Interior stairways

 

704 Cabinetry

 

705 Finish Materials/Millwork

 

706 Interior Doors

 

707 Finish Hardware

 

708 Finish Carpentry Labor

 

SUB-TOTAL DRYWALL/FINISH CARPENTRY  
Building Completion/Final Inspection/N.O.C. filed  
801 Countertops

 

802 Tub/shower/enclosures

 

803 Interior painting/Wall Coverings

 

804 Hard surface finish flooring

 

805 Carpeting

 

806 Built-in Appliances

 

807 Special Equipment (see property profile)

 

808 Security system

 

809 Intercom

 

810 Built-in Vacuum Cleaner

 

811 Finish Plumbing

 

812 Plumbing Fixtures

 

813 Finish Electrical

 

814 Lighting Fixtures

 

815 Finish Heating, Ventilating, Air Conditioning

 

816 Solar Backup

 

817 Bath Accessories

 

818 Tub and Shower Doors/Mirrors

 

819 Finish Grading

 

820 Pool/Spa

 

821 Hardscape-Driveway, Walkways, Steps

 

822 Landscaping

 

823 Irrigation System

 

824 Fencing including Gates

 

825 Touch-up/Final Cleaning

 

SUB-TOTAL BUILDING COMPLETION

 

TOTAL "SITE" COSTS

 

TOTAL PROJECT COSTS

 

www.harpfinancial.com